Find out where your line loses time, then fix the cause. Controls, mechanics and data are all on the table, so the fix is not limited to one trade.

MB AutomationSheet 4 of 12
Service
Production lines
Method
Measure, rank, fix, prove
Data
OEE and downtime
Based in
Sydney, NSW

Where lines lose time

Most lines lose output in the same few places. The first job is to find out which ones are costing you the most.

Short stops and jams

Stoppages of a few seconds that nobody writes down. They are often the biggest loss on a line, and the hardest to see without data.

Slow changeovers

Settings, tooling and recipes adjusted by hand and by trial. Recipe control and repeatable settings cut the time.

Unreliable equipment

Obsolete PLCs and drives, intermittent faults and no spares. Reliability work is as much about diagnostics as hardware.

One bottleneck machine

A single station sets the rate for the whole line while the others wait. Speeding up anything else makes no difference.

No usable data

Downtime reasons and counts written on paper, or not recorded at all, so decisions rest on opinion.

Manual handling

Steps that people do by hand because nobody has had the time to automate them.

How we improve a line

The same four steps on every job, so the result is a measured improvement and not a guess.

  1. 01

    Measure

    We walk the line, log downtime and short stops, and pull counts and machine states from the PLCs. Where no data exists, we set up logging first.

  2. 02

    Rank the losses

    Losses are sorted by size so the effort goes where it pays back. Availability, performance and quality are shown separately.

  3. 03

    Fix the cause

    Control changes, mechanical modifications, new drives or sensors, better changeover methods, or automation of a manual step.

  4. 04

    Prove it

    We measure again and report the before and after, so you can see what changed and what comes next.

What we can change

Because one engineer covers mechanics, electrics and controls, the fix can come from wherever the cause is.

  • Control logic and sequencing

    Machine states, interlocks and handshakes between machines, rewritten so the line flows.

  • Drives and speed matching

    Drive settings, ramps and line speed matching that reduce jams and starved or blocked stations.

  • Mechanical modifications

    Guides, feeders, transfers and fixtures redesigned in SolidWorks, with FEA where loads matter.

  • Data and OEE

    MB Automation Links logs PLC values into SQL, and dashboards show OEE and downtime by shift.

  • Upgrades without long shutdowns

    Obsolete PLCs, drives and HMIs replaced in planned windows, with the new system tested offline first.

  • Machine safety

    Guarding and safety functions reviewed against the AS 4024 series whenever a machine is modified.

Measure first: what OEE tells you

Overall equipment effectiveness, or OEE, multiplies three numbers. Availability is how much of the planned time the line actually runs. Performance is how fast it runs compared with its design rate. Quality is how much of the output is good the first time.

It is a simple way to compare shifts, machines and lines, and to see which loss to attack first. In the example on this page, availability is the weakest figure, so downtime is where the work would start.

Illustrative example, not a client result

  • Availability85% of planned time running
  • Performance90% of design speed
  • Quality98% good first time
  • OEE0.85 x 0.90 x 0.98 = about 75%

Production line questions

How do you find what is slowing a production line down?
We measure before we change anything. That means downtime reasons, short stops, cycle times and rejects, taken from the PLCs where possible and from observation where not. The losses are ranked by size, and the biggest one is fixed first.
Do I need new equipment to improve my line?
Not always. Many gains come from control logic, sensor placement, speed matching and better changeover methods. New equipment is only recommended when the data shows it is the real constraint.
Can you improve a line without stopping production?
Often. Measurement and software changes are developed and tested offline first. Mechanical and electrical changes are planned for scheduled shutdowns so the line is back on time.
What if my line has no data at the moment?
We start by logging. MB Automation Links can read values from PLCs and write them into SQL, or we observe the line manually for a few shifts to decide where to look first. A short period of logging is often enough to show where the biggest losses are.
Do you work with my existing PLCs and SCADA?
Yes. We work across Siemens, Rockwell, Beckhoff, Schneider, Omron, Mitsubishi and ABB, and with SCADA systems such as WinCC, FactoryTalk View and Ignition.
What does a line improvement project cost?
It depends on the size of the line and how much data exists. A scoped measurement and analysis stage comes first, with a written price, so you know the likely gains before you commit to any changes.

More questions and answers

Is your line losing time?

Tell us what the line makes, how fast it should run and where it stops. We will reply with the questions that matter and a sensible first step.